{"id":2358,"date":"2020-10-21T14:19:00","date_gmt":"2020-10-21T12:19:00","guid":{"rendered":"https:\/\/nodalis.fr\/signature-concession-stockage-eau-hydroelectricite-cameroun\/"},"modified":"2022-02-18T10:30:16","modified_gmt":"2022-02-18T09:30:16","slug":"signing-water-storage-concession-hydropower-cameroon","status":"publish","type":"post","link":"https:\/\/nodalis.fr\/en\/signing-water-storage-concession-hydropower-cameroon\/","title":{"rendered":"Signing of the water storage concession for hydropower in Cameroon"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">On September 7<sup>th<\/sup> 2020, the Cameroonian public company Electricity Development Corporation (EDC) signed its concession agreement with the State for the storage of water dedicated to hydropower generation. Effective since the commissioning of the Lom Pangar dam in 2016, this agreement formalizes the company\u2019s role as the water storage operator in the Sanaga basin and will enable EDC to fully endorse the associated responsibilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Since 2018, Nodalis has been supporting the Ministry of Water and Energy (MINEE) and EDC in the preparation of this agreement, including its technical specifications and the associated performance contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Having proposed and drafted the technical, legal and financial provisions of these contracts and facilitated the dialogue with the sector\u2019s key stakeholders, Nodalis now works since early 2020 for the MINEE and EDC \u2013 under AFD (<em>Agence Fran\u00e7aise de D\u00e9veloppement<\/em>) sponsorship \u2013 on the operationalization of these provisions. This new assignment targets EDC\u2019s operational procedures,\u00a0HR management, and financial balance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nodalis has been supporting the Ministry of Water and Energy and the sectoral regulation agency, ARSEL, for many years. We acted as financial advisor to the government for the Nachtigal hydroelectric IPP project transaction. We also supported the operationalization of SONATREL, the public Transmission System Operator. Finally, we carried out several assignments concerning the development of the sector and the regulation of the concession of AES-SONEL then ENEO.<\/p>\n","protected":false},"excerpt":{"rendered":"On September 7th 2020, the Cameroonian public company Electricity Development Corporation (EDC) signed its concession agreement with the State for the storage of water dedicated to hydropower generation. Effective since the commissioning of the Lom Pangar dam in 2016, this agreement formalizes the company\u2019s role as the water storage operator in the Sanaga basin and [&hellip;]","protected":false},"author":1,"featured_media":2171,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[161],"class_list":["post-2358","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project"],"acf":[],"_links":{"self":[{"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/posts\/2358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/comments?post=2358"}],"version-history":[{"count":0,"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/posts\/2358\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/media\/2171"}],"wp:attachment":[{"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/media?parent=2358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nodalis.fr\/en\/wp-json\/wp\/v2\/categories?post=2358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}